Spark Pack status
Answered our latest tool-list check yesterday with 7 tools. It will be marked verified after 3 successful checks in 7 days.
- Answered (30 days)
- 1 of 1 checks
- Last seen working
- 16 Nov, 06:16 UTC
- Last commit
- —
- Licence
- Not stated
Live checks
We call this hosted server's tools/list endpoint without credentials, from the public internet, every day while it answers and weekly otherwise.
- Answered
- Needs sign-in
- No answer
| Checked (UTC) | Result | Response time | Tools |
|---|---|---|---|
| 16 Nov, 06:16 | Answered | 0.4 s | 7 |
Tools (7)
Read from the server on 16 Nov 2026.
- list_capabilities
- Lists Spark Pack's tools, the regulations edition it targets, what it covers (nations, circuit types, cable types, installation methods) and what it deliberately does not do. Free, needs no input.
- size_cable
- Sizes a UK final circuit or sub-main and shows the working: design current (with cooker diversity), protective device rating, the smallest cable size that passes current-carrying capacity, voltage drop (3% lighting, 5% other) and earth fault loop impedance (Zs against the maximum for B, C or D breakers), plus a cpc adiabatic check. Returns `recommended` (size and every check with status pass, fail
- check_part_p
- Answers whether domestic electrical work in England or Wales must be notified to building control under Part P of the Building Regulations, with the reason and what to do next (self-certify through a competent person scheme within 30 days, or tell building control before starting). England and Wales differ: in Wales kitchens and outdoor areas are still special locations. Returns `notifiable` (true
- get_certificate_schema
- Returns the fields an Electrical Installation Certificate (eic), Minor Electrical Installation Works Certificate (minor_works) or Electrical Installation Condition Report (eicr) needs, as a JSON Schema the assistant fills from the job notes and test readings (spark-pack-certs-1.0 (for BS 7671:2018+A4:2026 certificates)). Includes which certificate to use when, and the contractor block prefilled fr
- check_certificate
- Checks a filled EIC, Minor Works certificate or EICR (shape from get_certificate_schema) and returns `ready_to_transfer`, every missing required field by path, errors (readings that fail: insulation resistance under 1 megohm at 500 V, measured Zs above the maximum for the breaker, RCD trip times too slow, wrong polarity, an EICR marked satisfactory with a C1 or C2) and warnings (Zs above 80% of ma
- check_grid_connection
- For solar PV, batteries, V2G chargers, EV chargers and heat pumps in Great Britain: says which network operator process applies and when. Generation: G98 (fully type tested, 16 A / 3.68 kW per phase or less: install, then notify within 28 days) or G99 (apply and wait for acceptance before installing), counting existing generation and battery inverters. Demand: the ENA EV charge point and heat pump
- trade_profile
- Checks the electrician's own business details (Nero Trade Profile v1: trading name, Companies House number, competent person scheme and number, postcode, contact) and returns them cleaned, with a stable `nero_trade_ref` computed from the scheme registration or company number. The same object, given as `trade` to the other tools, prefills certificates and grid forms. Spark Pack stores nothing. The