Skip to content

Spark Pack status

Answered our latest tool-list check yesterday with 7 tools. It will be marked verified after 3 successful checks in 7 days.

Answered (30 days)
1 of 1 checks
Last seen working
16 Nov, 06:16 UTC
Last commit
—
Licence
Not stated

Live checks

We call this hosted server's tools/list endpoint without credentials, from the public internet, every day while it answers and weekly otherwise.

  • Answered
  • Needs sign-in
  • No answer
Checked (UTC)ResultResponse timeTools
16 Nov, 06:16Answered0.4 s7

Tools (7)

Read from the server on 16 Nov 2026.

list_capabilities
Lists Spark Pack's tools, the regulations edition it targets, what it covers (nations, circuit types, cable types, installation methods) and what it deliberately does not do. Free, needs no input.
size_cable
Sizes a UK final circuit or sub-main and shows the working: design current (with cooker diversity), protective device rating, the smallest cable size that passes current-carrying capacity, voltage drop (3% lighting, 5% other) and earth fault loop impedance (Zs against the maximum for B, C or D breakers), plus a cpc adiabatic check. Returns `recommended` (size and every check with status pass, fail
check_part_p
Answers whether domestic electrical work in England or Wales must be notified to building control under Part P of the Building Regulations, with the reason and what to do next (self-certify through a competent person scheme within 30 days, or tell building control before starting). England and Wales differ: in Wales kitchens and outdoor areas are still special locations. Returns `notifiable` (true
get_certificate_schema
Returns the fields an Electrical Installation Certificate (eic), Minor Electrical Installation Works Certificate (minor_works) or Electrical Installation Condition Report (eicr) needs, as a JSON Schema the assistant fills from the job notes and test readings (spark-pack-certs-1.0 (for BS 7671:2018+A4:2026 certificates)). Includes which certificate to use when, and the contractor block prefilled fr
check_certificate
Checks a filled EIC, Minor Works certificate or EICR (shape from get_certificate_schema) and returns `ready_to_transfer`, every missing required field by path, errors (readings that fail: insulation resistance under 1 megohm at 500 V, measured Zs above the maximum for the breaker, RCD trip times too slow, wrong polarity, an EICR marked satisfactory with a C1 or C2) and warnings (Zs above 80% of ma
check_grid_connection
For solar PV, batteries, V2G chargers, EV chargers and heat pumps in Great Britain: says which network operator process applies and when. Generation: G98 (fully type tested, 16 A / 3.68 kW per phase or less: install, then notify within 28 days) or G99 (apply and wait for acceptance before installing), counting existing generation and battery inverters. Demand: the ENA EV charge point and heat pump
trade_profile
Checks the electrician's own business details (Nero Trade Profile v1: trading name, Companies House number, competent person scheme and number, postcode, contact) and returns them cleaned, with a stable `nero_trade_ref` computed from the scheme registration or company number. The same object, given as `trade` to the other tools, prefills certificates and grid forms. Spark Pack stores nothing. The