Skip to content

Site Pack status

Answered our latest tool-list check yesterday with 8 tools. It will be marked verified after 3 successful checks in 7 days.

Answered (30 days)
1 of 1 checks
Last seen working
16 Nov, 06:16 UTC
Last commit
—
Licence
Not stated

Live checks

We call this hosted server's tools/list endpoint without credentials, from the public internet, every day while it answers and weekly otherwise.

  • Answered
  • Needs sign-in
  • No answer
Checked (UTC)ResultResponse timeTools
16 Nov, 06:16Answered0.5 s8

Tools (8)

Read from the server on 16 Nov 2026.

list_capabilities
Lists Site Pack's tools, the date its rules were last checked, what it covers (nations, project types, work types) and what it deliberately does not do. Free, needs no input.
check_permitted_development
Checks a householder project in England against the permitted development limits in the GPDO 2015, Schedule 2, Part 1: single and multi storey rear extensions, side and wraparound extensions (Class A), loft dormers and hip to gable (Class B), rooflights (Class C), porches (Class D), outbuildings and garden rooms (Class E), and adding storeys (Class AA). Returns `verdict` (permitted_development, pr
check_building_regs
For one or more kinds of building work in England or Wales: is it notifiable building work, exempt (small outbuildings, ground level conservatories and porches up to 30 m2), self-certifiable by a competent person scheme (FENSA, Certass, HETAS, OFTEC, CompetentRoofer), or must it go to the Building Safety Regulator (higher-risk buildings, England). Says whether a building notice is allowed or full
party_wall_notices
Works out which notice the Party Wall etc. Act 1996 needs (line of junction, section 1; party structure, sections 2 and 3; adjacent excavation within 3 m or 6 m, section 6), and the dates: from `planned_start_date` the latest day to send it by the chosen method (by hand, first or second class post, email if agreed), or from `serve_date` the day it counts as served and the earliest start; plus the
cdm_duties
For a construction project in Great Britain (domestic by default): who holds the client's duties (on a domestic job they pass to the contractor, the principal contractor, or the principal designer under a written agreement), which roles must be filled (principal designer and principal contractor when there is more than one contractor), the core duties (construction phase plan, welfare, induction,
estimate_materials
Works out quantities from dimensions, with the working: bricks (60 a m2 per half brick leaf), blocks (about 10 a m2), cavity walls with ties, mortar from wall volume minus unit volume, cement bags and sand tonnes for a chosen mix, concrete for strip foundations and slabs (ready mix order rounded up to 0.25 m3, or site mixed 1:2:4 materials), and plasterboard sheets by size. Openings are deducted.
structural_triage
First-response triage when a customer reports a crack, a bulging or leaning wall, a sagging or fallen ceiling, a collapse, storm damage to a roof or chimney, a fallen tree or vehicle impact, a sagging floor, problems after a wall was removed, or signs of subsidence. Cautious by design: any danger to people makes it an emergency. Returns `urgency` (emergency, soon or routine: the same three speeds
trade_profile
Checks the builder's own business details (Nero Trade Profile v1: trading name, Companies House number, trade body or scheme and membership number such as FMB or TrustMark, postcode, contact) and returns them cleaned, with a stable `nero_trade_ref` computed from the scheme membership or company number. The same object, given as `trade` to the other tools, prefills their answers. Site Pack stores n