Skip to content

Ridge Pack status

Answered our latest tool-list check yesterday with 8 tools. It will be marked verified after 3 successful checks in 7 days.

Answered (30 days)
1 of 1 checks
Last seen working
16 Nov, 06:16 UTC
Last commit
—
Licence
Not stated

Live checks

We call this hosted server's tools/list endpoint without credentials, from the public internet, every day while it answers and weekly otherwise.

  • Answered
  • Needs sign-in
  • No answer
Checked (UTC)ResultResponse timeTools
16 Nov, 06:16Answered0.4 s8

Tools (8)

Read from the server on 16 Nov 2026.

list_capabilities
Lists Ridge Pack's tools, what it covers (nations, roof shapes, coverings, job types) and what it deliberately does not do. Free, needs no input.
roof_takeoff
Works out a pitched roof's slope area, rafter length, ridge, hips, eaves and verges from the plan size and pitch, then a materials list: tiles or slates, battens, underlay rolls, ridge and hip tiles, hip irons, valleys, nails, eaves trays, ventilation and dry verge units, with waste. Every step of the working is shown. Geometry is exact; quantities resting on product figures are indicative unless
check_pitch_headlap
Checks a roof covering type against the pitch, the headlap and the batten gauge: is the pitch below the typical minimum for that kind of tile or slate, is the headlap enough for the exposure, does the gauge leave the headlap you want. Returns overall (ok_subject_to_maker_data, check_with_maker or fail), each check with its working, and what to confirm. Indicative: always confirm against the maker'
weather_window
Gets the hourly forecast for a UK postcode (today and up to 8 days ahead, from MET Norway) and checks each working hour against wind, gusts, rain, frost and the material's limits for the job type (tiling, membranes and sheets, torch-on, liquid coatings, EPDM adhesive, mortar bedding, lead work, inspection). Returns each day as good, caution or no_go with good hours, the best window, max gust in mp
check_building_regs
England and Wales. Says whether a roofing job is notifiable to building control (re-covering 25% or more of a roof, a change of covering, structural work, rooflights, dormers, solar, new roofs), whether Part L wants the whole roof insulated (England: more than 50% of the roof or more than 25% of the whole envelope renovated, target 0.16 W/m2K from Approved Document L; Wales: over 25%), who signs i
work_at_height_plan
Builds the working at height and scaffold checklist for a roofing job (hierarchy of controls, scaffold to TG20 with guardrails, 7-day inspections, ladders only for short work, roof ladders, flat roof edges, fragile surfaces, power lines, highway licences, hot works, asbestos, rescue), the CDM 2015 duties (construction phase plan, domestic client, F10 notification test), a scored risk register (lik
storm_triage
Triage for storm damage and roof leaks. Gives an urgency of routine, soon or emergency (the same three speeds as Nero Work) with the reasons, safe first steps for the homeowner (no climbing, electrics, bulging ceilings, gas, falling debris, insurer), the temporary cover the roofer should use for each problem (tarpaulin battened over the ridge, tile clips, tingles, flashing tape, cold patch), what
trade_profile
Checks the roofer's own business details (Nero Trade Profile v1: trading name, Companies House number, competent person scheme and number, postcode, contact) and returns them cleaned, with a stable `nero_trade_ref` computed from the scheme registration or company number. The same object, given as `trade` to the other tools, prefills their answers. Ridge Pack stores nothing. The same profile and re