CalderFlow status
Answered our latest tool-list check 15 hours ago with 10 tools. It will be marked verified after 3 successful checks in 7 days.
- Answered (30 days)
- 1 of 1 checks
- Last seen working
- 16 Nov, 18:15 UTC
- Last commit
- —
- Licence
- Not stated
Live checks
We call this hosted server's tools/list endpoint without credentials, from the public internet, every day while it answers and weekly otherwise.
- Answered
- Needs sign-in
- No answer
| Checked (UTC) | Result | Response time | Tools |
|---|---|---|---|
| 16 Nov, 18:15 | Answered | 1.6 s | 10 |
Tools (10)
Read from the server on 16 Nov 2026.
- create_flowchart
- Create a presentation-ready flowchart or architecture diagram from Mermaid source. Use for branching processes, decision trees, and system architecture. Rules: start with 'flowchart TD' or 'flowchart LR'; solid arrows only (-->, optionally with |labels|); node shapes: A[Process] B{Decision} C([Start/End]). CalderFlow presents decisions as compact amber cards and terminals as green states, so use s
- create_chevron_chart
- Create a sequential/chevron chart: a linear sequence of steps, phases, or stages (e.g. onboarding steps, project phases). NOT for branching logic — use create_flowchart for that. Include a 1-2 sentence description per step to make it presentation-ready. Aim for 4-6 steps: Presentation is one slide of at most 6. For a longer process, follow up with edit_chart set_presentation_steps choosing the 4-6
- create_funnel_chart
- Create a funnel chart for filtering/narrowing processes where quantities reduce per stage (conversion funnels, pipelines). Include stage values when numbers are available; set conversionRates for proportional widths.
- create_lifecycle_chart
- Create a lifecycle chart: phases across the top and milestones plotted on a curve. Each milestone has a level 1-10 setting its height — bell curves, S-curves, dips all emerge from levels. Use for product lifecycles, customer journeys, adoption/maturity curves. Every milestone needs a phaseId.
- create_timeline_chart
- Create a timeline of events in chronological order (roadmaps, company history, sprint/release schedules). Every event needs a marker: supplied dates, relative time for a proposed plan, or Phase 1, Phase 2, etc. for an undated process. Never invent factual dates or measured durations. Include concise descriptions; group related events into eras.
- create_erd_chart
- Create an entity-relationship diagram (database schema / data model) with typed fields, PK/FK markers, and crow's-foot relationships. Entity names UPPER_SNAKE_CASE, 3-8 focused fields each.
- edit_chart
- Edit an existing chart. Call get_chart first to see its current spec, then pass tool_calls (surgical edits) and/or mermaid (full source replacement, flowchart/ERD only). A create_* tool call replaces the chart's data wholesale and can switch its type. Valid tool names — flowchart: style_chart, update_node, delete_node, add_node, connect_nodes, delete_edge, organize_sections, add_section, update_se
- get_chart
- Fetch a chart's current spec (JSON) and editable source text, plus its share URL.
- list_charts
- List your CalderFlow charts (id, title, type, share URL), newest first.
- delete_chart
- Permanently delete a chart you own.